If the load carried by a CBR specimen at 2.5 mm penetration is 35 kg per square cm, the CBR of the soil is
- A. 10%
- B. 35%
- C. 50%
- D. 70%
Learn Civil Engineering • Visualize Concepts • Build Strong Fundamentals
Civil Engineering concepts explained from absolute zero to advanced level, with simple explanations, visualization and practical engineering examples.
▶ Visit YouTube Channel
0 Comments