4 men and 3 women finish a job in 6 days, and 5 men and 7 women can do the same job in 4 days. How long will 1 man and 1 woman take to do the work?
Ashutosh Nautiyal
سبتمبر 30, 2021
4 men and 3 women finish a job in 6 days, and 5 men and 7 women can do the same job in 4 days. How long will 1 man and 1 woman take to do the work?
A. 22 [2/7] days
B. 25 [1/2] days
C. 5 [1/7] days
D. 12 [7/22] days
Show Answer
The correct answer is option
A. 22 [2/7] days
. Can you explain this answer in the comments?
View Complete Solution Here
Books I recommend for Quantitative Aptitude:
1. How to Prepare for Quantitative Aptitude for CAT by Arun Sharma
2. Ace Quantitative Aptitude For Banking and Insurance
3. Quantitative Aptitude Quantum CAT by Sarvesh K Verma
4. Quantitative Aptitude for Competitive Examinations by R.S. Aggarwal
5. Best 4000 Smart Practice Questions for Banking by S. Chand Experts
0 تعليقات
أحدث
أقدم
Popular Posts
A point P is 50 mm away from both the reference planes. Draw its all possible projections.
أبريل 20, 2020
Strength of Materials (SOM) GATE Solved Practice Questions | Part 1
يونيو 22, 2021
Forces Acting on Bridges: Types of Loads in Bridge Engineering Explained
يوليو 01, 2026
Articles
3/Article/post-list
Recommended For You
Contact form
0 تعليقات